Ssis211enjavhdtoday11092021025518 Min May 2026

Post-event recommendations included scheduling a targeted health check over the next ground contact, increasing telemetry sampling of the aft power bus for the next 24–72 hours, and performing an engineering review of recent power cycling commands to rule out command-induced switching. If the anomaly recurs or if voltage/current excursions exceed thresholds, engineers should consider isolating the affected regulator and commanding a controlled power reconfiguration to preserve payload integrity.

Scroll to Top